What is the M560/M580 initialization time and system start-up check completion time?

The M560/M580 OpenECU platform initialization time (including system start-up check completion time) depends on application size and includes calculating a checksum of the entire program image. The maximum time to start application code on the primary microcontroller is approximately 110ms. The maximum time to start application code on the secondary microcontroller is 255ms after the primary controller enables the secondary or a secondary-only reset; this is 365ms after a hard reset if the primary application code enables the secondary controller immediately (during primary application initialization).

      Copyright © 2016 Pi Innovo, All rights reserved